As a new option, for projects that meet minimum requirements, licensed contractors may complete an application first using SolarAPP+ in lieu of submitting construction plans and other required supplemental technical documentation to the Permit Center.
Projects must follow requirements outlined in the Eligibility Checklist to use SolarAPP+. The Eligibility Checklists can be found here.
At this time, owner-builder or projects that included Energy Storage Systems are not eligible for SolarAPP+.
SolarAPP+, short for Solar Automated Permit Processing, is an online web portal that automates the plan review process for permits to qualified businesses or individuals to install code-compliant residential photovoltaic (PV) systems. Based on model building, electrical, and fire codes, SolarAPP automatically performs a compliance check based on inputs supplied by the contractor to ensure the proposed system is safe and code compliant. Installation practices, workmanship, and adherence to the approved design are then verified by the AHJ through the inspection process.
To get started on SolarAPP+, click here. Please note that SolarAPP+ is an additional $35.00 paid directly to SolarAPP+.
For SolarAPP+ FAQs, click here.
Once an approval is received from SolarAPP+, a permit application shall be submitted online via eTRAKiT or at the Permit Center. City of Rocklin permit fees and inspections shall apply.
As a new option, for projects that meet minimum requirements,
licensed contractors may complete an application
first using SolarAPP+ in lieu of submitting construction plans
and other required supplemental technical documentation to the
Permit Center.
Projects must follow requirements outlined in
the Eligibility Checklist to use SolarAPP+. The
Eligibility Checklists can be found here.
At this time, owner-builder or projects that included Energy
Storage Systems are not eligible for SolarAPP+.
SolarAPP+, short for Solar Automated Permit Processing, is an
online web portal that automates the plan review process for
permits to qualified businesses or individuals to install
code-compliant residential photovoltaic (PV) systems. Based on
model building, electrical, and fire codes, SolarAPP
automatically performs a compliance check based on inputs
supplied by the contractor to ensure the proposed system is safe
and code compliant. Installation practices, workmanship, and
adherence to the approved design are then verified by the AHJ
through the inspection process.
To get started on SolarAPP+, click here. Please note that
SolarAPP+ is an additional $35.00 paid directly to SolarAPP+.
For SolarAPP+ FAQs, click here.
Once an approval is received from SolarAPP+, a permit
application shall be submitted online via eTRAKiT
or at the Permit Center. City of Rocklin permit fees and
inspections shall apply.
Step 1: Create an Account with Solar APP+
In order to use Solar APP+, you will need to register for an
account. More information about the process can be found on the
Solar APP+ website
here.
Step 2: Submit Plans Through Solar APP+
You can find out how to use the Solar APP+ system by clicking
here.
There are also free trainings available through the Interstate
Renewable Energy Council here.
Step 3: Pay Solar APP+ Fee
If you use Solar APP+, you must pay a $35 administrative fee
directly to Solar APP+. The City of Rocklin does not collect or
receive this fee. Using the Solar APP+ automatic plan review
system is optional, but if you use the system
you must pay the fee. You can still submit plans directly to the
City of Rocklin if you do not want to pay this additional fee.
Step 4: Plan Approval & Submission to City of
Rocklin
The Solar APP+ system will review the plans and issue an approval
(for
more information about that process, see the help guides
here) Once Solar APP approves the plans, you will upload them
to the City of Rocklin’s eTRAKiT
system.
Step 5: Fees And Permit Issuance
eTRAKiT will collect fees for the City of Rocklin and issue the
permit for installation
Step 6: Inspections
Once eTRAKiT issues your permit, you can install the PV panels
and schedule your inspection. You can schedule an inspection
through eTRAKiT or by calling the City of Rocklin Building
Division at (916) 625-5120.
Please note: Every project is different and the process may vary
slightly. The information provided is for general reference only.